路沿石模具制作工序
1、首先将面层配比水泥100斤、铁红8-9斤、细沙200斤、放入搅拌机至比较均匀、将光亮剂5 斤放入约25斤的水中、略以搅拌、放入搅拌机、然后在添加适量、搅拌成不稀不稠流动性好的面料至于容器。
1. Firstly, mix 100 kg of cement, 8-9 kg of iron red, 200 kg of fine sand into the mixer, put 5 kg of brightener into 25 kg of water, mix slightly, put into the mixer, and then add appropriate amount, mix into a non-dense and fluidity good fabric as container.
1. First of all, mix 100 kg cement, 8-9 kg iron red, 200 kg fine sand into the mixer to more uniform, brightener 5 kg into about 25 kg of water, slightly stirring, put in the mixer, and then add a suitable amount of stirring, mixing into a good fluidity not thinner fabric container.
1. First of all, mix 100 kg cement, 8-9 kg iron red, 200 kg fine sand in to the mixer to more uniform, brightener 5 kg in to about 25 kg of water, slightly stirring, put in the mixer, and then add a suitable amount of stirring, mixing in to a good fluidity not thinner fabric container.
2、将面层料适量(约0.5-1厘米厚)放入模盒内、略加振动5-10秒、稍作放置15-30分钟(软硬始终)再放入底层料。
2. Put a proper amount of fabric (about 0.5-1 cm thick) into the mould box, add vibration for 5-10 seconds, and place it for 15-30 minutes (hard and soft always) before putting it into the bottom material.
2. Put proper amount of the material (about 0.5-1 cm thick) into the mold box, vibrate slightly for 5-10 seconds, place it for 15-30 minutes (soft and hard always) and then put it into the bottom material.
2. Put proper amount of the material (about 0.5-1 cm thick) into the mold box, vibrate slightly for 5-10 seconds, place it for 15-30 minutes (soft and hard always) and then put it into the bottom material.
3、底层放入后、在振动15-30秒15-30秒后生产流程基本完成。
3. After the bottom layer is put in, the production process is basically completed after 15-30 seconds of vibration and 15-30 seconds.
3, after the bottom layer is put in, after the vibration 15-30 seconds 15-30 seconds, the production process is basically completed.
3, after the bottom layer is put in, after the vibration 15-30 seconds 15-30 seconds, the production process is basically completed.
4、养护、放入适当封闭的环境内养护为佳,尽量避免阳光暴晒、风吹,根据气温和环境1-3天脱模为佳,在养护3-5天后便可出厂使用
4. Maintenance and proper enclosed environment are preferable. Avoid sunshine and wind as far as possible. According to temperature and environment, it is preferable to demould for 1-3 days. After 3-5 days of maintenance, it can be used in the factory.
4. Maintaining and putting in proper enclosed environment is preferable, avoiding sun exposure and wind blowing as far as possible, demoulding is preferable according to temperature and environment for 1-3 days, and leaving factory after 3-5 days of maintenance.
4. Maintaining and putting in proper enclosed environment is preferable, avoiding sun exposure and wind blowing as far as possible, demoulding is preferable according to temperature and environment for 1-3 days, and leaving factory after 3-5 days of maintenance.